Order for 23 MW in Niigata Prefecture, Japan 2020-04-29
Order for 23 MW in Niigata Prefecture, Japan

The Tohoku Electric Power Company's toughest case in Japan passed the examination, and we received an order. The gantry system is designed according to the requirements and wishes of each case. It is possible to select and design the frame specifications by analysis, even under various complex ground conditions. It can also be used in sloping areas and heavy snow areas.
Leave a message

Leave a message

    If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

About Us

contact

top