Order for 23 MW in Niigata Prefecture, Japan
2020-04-29
Order for 23 MW in Niigata Prefecture, Japan
The Tohoku Electric Power Company's toughest case in Japan passed the examination, and we received an order. The gantry system is designed according to the requirements and wishes of each case. It is possible to select and design the frame specifications by analysis, even under various complex ground conditions. It can also be used in sloping areas and heavy snow areas.